Compact entry lines for new or localized production. 600–900 trays/hour on 2–3 mould stations.
ECPS is the small-production family — compact lines built for first installations, limited area and lower utility demand. Both models run the full four-stage ECP process; choice is capacity and mould stations, not capability.
These operating-project records provide buyer context only; they do not identify the historical installation as a current catalog model.
Two models share the same platform — the right choice depends on your target output and site resources.
| Model | ECPS-600E ECPS | ECPS-900E ECPS |
|---|---|---|
| Rated output | 600 trays/hour | 900 trays/hour |
| Family | ECPS — Compact | ECPS — Compact+ |
| Mould stations | 2 | 3 |
| Water — initial fill | 3 m³ | 4 m³ |
| Max electrical | 65 kW | 75 kW |
| Workers/shift | 2–3 | 2–3 |
| Recommended area | 150 m² | 150 m² |
| Pulper | — | — |
| Vacuum system | — | — |
| Air compressor | — | — |
| Burner (thermal) | — | — |
| Air tank | — | — |
ECPS-600E vs ECPS-900E: one additional station and 300 more trays/hour, with the same 150 m² and 2–3-worker site envelope.
Producers establishing a first line, pilot plants or regional facilities where 600–900 trays/hour meets demand and 150 m² with 2–3 workers and 65–75 kW max is the practical site envelope. Upgrade path is ECPM when demand exceeds 900/hour.
When required output exceeds 900 trays/hour, compare the medium-production family. Next: ECPM — Medium Production
Send us your target product, capacity and site conditions. We respond with the line configuration that fits.