Request a quote
Machine families

ECPS — Small Production

Compact entry lines for new or localized production. 600–900 trays/hour on 2–3 mould stations.

ECPS is the small-production family — compact lines built for first installations, limited area and lower utility demand. Both models run the full four-stage ECP process; choice is capacity and mould stations, not capability.

Relevant verified project evidence

These operating-project records provide buyer context only; they do not identify the historical installation as a current catalog model.

Compare within the family

Two models share the same platform — the right choice depends on your target output and site resources.

Technical comparison
Model ECPS-600E
ECPS
ECPS-900E
ECPS
Rated output 600 trays/hour900 trays/hour
Family ECPS — CompactECPS — Compact+
Mould stations 23
Water — initial fill 3 m³4 m³
Max electrical 65 kW75 kW
Workers/shift 2–32–3
Recommended area 150 m²150 m²
Pulper ——
Vacuum system ——
Air compressor ——
Burner (thermal) ——
Air tank ——
Hide detailed BOM
  • Capacity reference: standard 30-egg tray, 320 × 320 mm mould module.
  • Water: initial closed-loop fill volume (m³) — not hourly consumption; closed-loop circulation with ~20% monthly make-up due to evaporation under typical conditions.
  • Power: maximum electrical demand during startup/peak (kW) — average running draw is lower. Burner values are thermal (kW).
  • Labour: workers per shift for whole line operation; machine cycle is automatic (no manual during cycle).
  • Detailed BOM rows show verified values only for ECPL-1800E/ECPL-2200E; other models show — pending owner verification.

ECPS-600E vs ECPS-900E: one additional station and 300 more trays/hour, with the same 150 m² and 2–3-worker site envelope.

Who should choose ECPS?

Producers establishing a first line, pilot plants or regional facilities where 600–900 trays/hour meets demand and 150 m² with 2–3 workers and 65–75 kW max is the practical site envelope. Upgrade path is ECPM when demand exceeds 900/hour.

Upgrade path

When required output exceeds 900 trays/hour, compare the medium-production family. Next: ECPM — Medium Production

Tell us about your production project — ECPS — Small Production

Send us your target product, capacity and site conditions. We respond with the line configuration that fits.

Request a quote